Alley_Cat

Devoted Member
Jul 20, 2019
8,993
17,559
How i love to read all these comments :D.
So many ppl keep complaining about the same things for xxx times but yet everyone are still here waiting for next update :D:D:D.
I'm mainly here for the occasional question about lesbian content. And to provide counterpoint to generalised comments about what players want and are looking forward to. While I was hoping that the Dylan route might get interesting enough for me to start playing it, it's devolved into the same crap that I started playing this game to get away from.

Haven't downloaded the last half-dozen or so updates. Unlikely to download the next three. I'm just hoping that when we get to the next Ellie event, L&P switches back from the current porn-logic.
 

PushMyButton

Member
Jan 22, 2023
113
243
for example, let's take the game The Final Task, there are few words, but I liked the game there more, and I think that clones of the game appeared not because of the popularity of the game, but because there is not so much sexual content in the game, and there is more of it in the game. clones than in the original
 

Renrut

Member
Mar 6, 2020
181
160
How i love to read all these comments :D.
So many ppl keep complaining about the same things for xxx times but yet everyone are still here waiting for next update :D:D:D.
Not worth it anymore. Basically I watch the notifications. If the number has changed great, otherwise this tread is useless. I watch the fan art thread though.
 
Jan 20, 2022
229
557
L&P said the first part would be "Hot" but, let's say, more romantic and special. And he also said...

1) Second part will be hotter.

2) Overall Dylan will reach no less than Sam.

If it's not a lie in this update should be real kisses (not just sex-ed), sucking boobs, touching etc. at least the same that Sam did.

We will see...

Where did the author say that the second part would be even hotter?
 

kimber700

Member
Oct 28, 2022
226
645
I might be wrong but my theory is as follows:

In the current progress, 15/15/0/0/0/0, at first we talk about the first two; a created scene and a rendered scene.

1. Two 85% should be achieved the first two sectors.
2. Assuming 5% progress a day (only business day. I did not count Saturday and Sunday), 25% a week.
3. To achieve 170% (85%x2), 34 days are needed, which is 6.8 weeks (let say 7 weeks)
4. Now talk about the other 4 sectors.
5. L&P said the first two sector takes over 85% of the total work.
6. If the work equals the time, 15% of total time left.
7. 15% of total 600% (100% x 6 sectors) is 90%.
8. The first two sectors take 7 weeks to develop (this is 510% of total work), then 1.24 week is needed for the rest of 90% of 600%. This calculation is 510/7=72.86, 90/72.86=1.24.
9. Now add up 7 plus 1.24 equals 8.24 weeks.
10. July 22 is 9th weekend from today (May 27.)
11. I add a week or two for a grace period since L&P takes a rest or any unexpected delay occurs.
12. ... So, July 28 to August 4

It's just my thought based on the progress. I wish I'm wrong and developed earlier than my thought.
 

Alley_Cat

Devoted Member
Jul 20, 2019
8,993
17,559
for example, let's take the game The Final Task, there are few words, but I liked the game there more, and I think that clones of the game appeared not because of the popularity of the game, but because there is not so much sexual content in the game, and there is more of it in the game. clones than in the original
Fan Art games like that though rely on the setup created by L&P. Without that, the fan art has no meaning. I haven't looked at naughty naf's "Aiden's Revenge", purely because I haven't a clue what the hell he could be getting revenge for. Any negative consequences coming to him - like getting beaten up by Morello's thugs - are entirely of his own doing. But that's me. Other people's tastes and kinks are their own.

My point being, sometimes it's the seemingly pointless stuff that makes all the difference. Push comes to shove, I don't begrudge the incessant drivel that I've come to expect from the Dylan route, as long as it doesn't effect my playthrough. With the hope of an Ellie route in the not to distant future, yeah, I am going to keep coming back. While the line is becoming increasingly thin, Ellie is still one of my favourite characters. Might not take much though to topple her from my sig - she's barely holding on as it is.
 

MortaL7

New Member
Oct 30, 2021
3
0
I can't install the 1080p version from mega, what should I do?

edit : nvm i installed the normal part 1 instead
 

Juidas

Member
May 14, 2019
352
453
I might be wrong but my theory is as follows:

In the current progress, 15/15/0/0/0/0, at first we talk about the first two; a created scene and a rendered scene.

1. Two 85% should be achieved the first two sectors.
2. Assuming 5% progress a day (only business day. I did not count Saturday and Sunday), 25% a week.
3. To achieve 170% (85%x2), 34 days are needed, which is 6.8 weeks (let say 7 weeks)
4. Now talk about the other 4 sectors.
5. L&P said the first two sector takes over 85% of the total work.
6. If the work equals the time, 15% of total time left.
7. 15% of total 600% (100% x 6 sectors) is 90%.
8. The first two sectors take 7 weeks to develop (this is 510% of total work), then 1.24 week is needed for the rest of 90% of 600%. This calculation is 510/7=72.86, 90/72.86=1.24.
9. Now add up 7 plus 1.24 equals 8.24 weeks.
10. July 22 is 9th weekend from today (May 27.)
11. I add a week or two for a grace period since L&P takes a rest or any unexpected delay occurs.
12. ... So, July 28 to August 4

It's just my thought based on the progress. I wish I'm wrong and developed earlier than my thought.
Some good logic there especially as it comes at the end of the month (payday), however you have not included the L&P factor so you may need to add in some random weeks where they try something new or add video sequences or just go and lay out in the sunshine, maybe I've just been here too long and become very negative but hope you're right.
 
  • Like
Reactions: restlez

armion82

Message Maven
Mar 28, 2017
12,171
16,594
I might be wrong but my theory is as follows:

In the current progress, 15/15/0/0/0/0, at first we talk about the first two; a created scene and a rendered scene.

1. Two 85% should be achieved the first two sectors.
2. Assuming 5% progress a day (only business day. I did not count Saturday and Sunday), 25% a week.
3. To achieve 170% (85%x2), 34 days are needed, which is 6.8 weeks (let say 7 weeks)
4. Now talk about the other 4 sectors.
5. L&P said the first two sector takes over 85% of the total work.
6. If the work equals the time, 15% of total time left.
7. 15% of total 600% (100% x 6 sectors) is 90%.
8. The first two sectors take 7 weeks to develop (this is 510% of total work), then 1.24 week is needed for the rest of 90% of 600%. This calculation is 510/7=72.86, 90/72.86=1.24.
9. Now add up 7 plus 1.24 equals 8.24 weeks.
10. July 22 is 9th weekend from today (May 27.)
11. I add a week or two for a grace period since L&P takes a rest or any unexpected delay occurs.
12. ... So, July 28 to August 4

It's just my thought based on the progress. I wish I'm wrong and developed earlier than my thought.
The first 2 were 85% before when there was only 4 progress bars.I am pretty sure with 6 bars,they are not 85% anymore.
 
  • Like
Reactions: MonaMS

kimber700

Member
Oct 28, 2022
226
645
The first 2 were 85% before when there was only 4 progress bars.I am pretty sure with 6 bars,they are not 85% anymore.
Ok, make sense.
The first two (200%) weights 66.7% of 600%., so the rest 400% weights 33.3% of total work.
My math 7 weeks to cover the first two (170% of 200%) is not changed (see the previous calculation in my post.)
The rest 400% / 7weeks = 57.17 (now the factor is smaller)
33.3% of total 600% (100% x 6 sectors) is 199.8%.
199.8/57.17=3.5 weeks need for the rest of 400%
7 weeks plus 3.5 weeks equals 10.5 weeks.
The revised date would be the second week of August (by August 12).
 
Last edited:

kimber700

Member
Oct 28, 2022
226
645
:unsure: not sure the math is quite right there... that's 30% out of 600%. Over all progress is 5% of 100%, in 6 days... So... in about 4 more months it'll be done...?

I'm gonna go take a nap, now :cautious:
I think also you need to consider the first two takes 85% of total work (in 4 categories) that should covert to 66.7% in 6 categories now.
 
3.20 star(s) 483 Votes