- Jul 20, 2017
- 16,254
- 101,114
The art class(Aiden event)and the 2nd pose for Sophia wearing the Delia negligee is one case where the set up outstripped the rendering time.Just once, to be honest.
And maybe it is acquired experience for L&P.
I also think it is a matter of point of view.
According to statistics provided by quency77 (in reviews section, page #4 today), the last update was in the average in terms of rendering per day. And qualitatively I think we are above average.
The number of renderings is an indicator, but not always the principal source of concern.
There are events that can generate a lot of renderings, without requiring a lot of work : for example, all the places already known which do not need to be recreated. If there is a hot scene around the pool during the day, everything is already in place.
![]()
The dev used a ready made set with just a few pieces added and probably his own lighting, but the negilgee is a nightmare to set up in the poses done by Sophia and this is why I think he spent so long on this event.I do think however that it is crazy to spend so much time on one event(my opinion) but now having messed about with the scene I can understand now why it took so long.
Last edited: