No. Takeda on the stream showed that 28 out of 50 events are ready for 04/19/22
Now he is diligently engaged in art and draws for 5-8 hours.
I myself have some experience in creating RPGs (I'm a translator) so I think it will be finished by the end of the year.
Or you could do the math: He does 2 scenes per month, so that would mean the game needs 16 months to be finished, that said, lately he's been making animations and extra poses that weren't there for the earlier scenes which means he could take longer per scene from now on so it's 16 months at the earliest.
Example of this is the rietta scene that came out this month is just extra poses for an earlier scene, the upcoming arika scene has at least 2 variations too but i've seen a third variation wich I'm not even sure is a thing that's coming or some sketches that were rejected.
But if you think about it if the arika scene doesn't come out this month and the rietta scene was just another part of a previous scene, that would mean that we didn't even get a single scene this month.
Meaning, that with this new higher quality workflow. We could be looking at a pace of one scene per month, or 32 months till release.
That is of course if he doesn't go back to remake the previous scenes with prroper anime like animations instead of the current 3 frame slideshows that those animations have, which quite frankly I hope he does.