- Oct 28, 2022
- 227
- 649
I might be wrong but my theory is as follows:Why?
In the current progress, 15/15/0/0/0/0, at first we talk about the first two; a created scene and a rendered scene.
1. Two 85% should be achieved the first two sectors.
2. Assuming 5% progress a day (only business day. I did not count Saturday and Sunday), 25% a week.
3. To achieve 170% (85%x2), 34 days are needed, which is 6.8 weeks (let say 7 weeks)
4. Now talk about the other 4 sectors.
5. L&P said the first two sector takes over 85% of the total work.
6. If the work equals the time, 15% of total time left.
7. 15% of total 600% (100% x 6 sectors) is 90%.
8. The first two sectors take 7 weeks to develop (this is 510% of total work), then 1.24 week is needed for the rest of 90% of 600%. This calculation is 510/7=72.86, 90/72.86=1.24.
9. Now add up 7 plus 1.24 equals 8.24 weeks.
10. July 22 is 9th weekend from today (May 27.)
11. I add a week or two for a grace period since L&P takes a rest or any unexpected delay occurs.
12. ... So, July 28 to August 4
It's just my thought based on the progress. I wish I'm wrong and developed earlier than my thought.