CREATE YOUR AI CUM SLUT ON CANDY.AI TRY FOR FREE
x

Grim1966

Newbie
Jun 20, 2018
90
60


View attachment 4265106

Hello friends.
Last week seems to me not as productive as the previous one. We have not managed to fully set up the work for the beginning of the assembly process (it's being worked on), also the work in the first two blocks has slowed down, but I'm glad that there is only a little bit left. I'll try to speed up the completion of these tasks next week. To finish rendering until the 1st star, we're mostly missing just animations, and this is, as you know, a lot of frames, since there can be a dozen or more animations in a scene.
I've changed the GENERAL PROGRESS table a bit, now adding percentages for each blocks and an overall percentage. You can see the actual figures of the TOTAL progress at the link There you can clearly see the stage of development of the next version of the game. It lists all the work that needs to be completed, as well as a brief description of it.
Any questions you may have, ask in the comments and I will answer them.
What's been done this week:
+I continue to work on checking scenes up to 2nd star.
+Checked 1 story scene for 2nd star. Marked missing frames and necessary corrections.
+Corrected and finalized 2 scenes (1 story scene and 1 FreeRom scene). Story scenes up to 1st star fully finalized.
+Artists and I continue work on more fixes, this work is ongoing.
+Rendered and prepared for further processing 2 scenes (1 story scene and 1 FreeRom scene). However, an important thing to mention, almost all renders for scenes are ready, but a scene is not considered fully rendered until all animations in that scene are rendered as well. So there are still scenes with animations left, which means the progress of this block will slow down a bit.
+Rendering work continues.
+Processed 11 scenes (7 story scenes and 4 side character scenes).
+Processing work continues.
+Color correction of 11 scenes (8 story scenes and 3 side character scenes) is done.
+Color correction work continues.
+Launch a full time focus on the assembly of scenes into code has not yet been possible, but preparatory work has been finished. Starting next week, there should be increase in figures.
+Work on assembling scenes into code continues.

Also in this post I wanted to attach pictures of the new locations for the first time. But there are too many pictures, so today I'll show one of them and next week I'll make some more posts to show the rest.
The interiors have been completely redesigned, the back lights have been removed, quality light has been set up, new sources of decorative lighting have been added, hidden lights have been added, textures and colors of walls and floors have been changed. In general, you'll see everything on the images. I myself would like to live in such locations. *This locations without backgrounds and post-processing - they will be added later.
Elena's room MORNING (BEFORE/AFTER)


Elena's room DAY (BEFORE/AFTER)


Elena's room EVENING (BEFORE/AFTER)


Elena's room NIGT (BEFORE/AFTER)


I hope you like the changes
With great gratitude, Super Alex.
LOL a month ago you were going to finish in a few days... Just keep on I can wait but don't make it sound like "its almost done". How big is your staff? I assume they get some of the $ from patron?
 

Grim1966

Newbie
Jun 20, 2018
90
60
Who are these room design changes for? Did someone ask for them? Just to keep delaying it.
I was thinking the same thing. They seemed fine to me. allot of waisted effort when so much more interesting things could be worked on. I wish I have the talent to make something like this just to see what all goes into it. I am quite sure it is not easy to do and probably under appreciated but still don't fix something that isn't broken!
 
  • Like
Reactions: Vescero

loki0401

Newbie
Jun 8, 2021
16
6
AMNESIA.PROGRESS REPORT #8 is out。

+7% progress to level 1 in the piggy bank. We still have difficulties with the beginning of programming, because our programmer (who is outsourced) is busy with third-party projects and hasn't had time for ours. Since the game code has been completely rewritten, we need the programmer to build the first few scenes and write the instructions (which we are waiting for), and then we can do the rest ourselves.
 

Gari Fuze

Newbie
Feb 19, 2020
79
391
LOL a month ago you were going to finish in a few days... Just keep on I can wait but don't make it sound like "its almost done". How big is your staff? I assume they get some of the $ from patron?
I like the room renders, but is this game about room design or something else?
 

devonY7

Well-Known Member
Feb 3, 2020
1,686
2,561


1733076537208.jpeg

Hello friends.
+7% progress to level 1 in the piggy bank. We still have difficulties with the beginning of programming, because our programmer (who is outsourced) is busy with third-party projects and hasn't had time for ours. Since the game code has been completely rewritten, we need the programmer to build the first few scenes and write the instructions (which we are waiting for), and then we can do the rest ourselves.
You can see the actual figures of the TOTAL progress at the link . There you can clearly see the stage of development of the next version of the game. It lists all the work that needs to be completed, as well as a brief description of it.
Any questions you may have, ask in the comments and I will answer them.

What's been done this week:
+I continue to work on checking scenes up to 2nd star and added FreeRoms to this list of scenes.
+Checked 11 FreeRoms scenes. Marked missing frames and necessary fixes.
+Corrected and finalised 9 scenes (1 secondary story scene and 8 FreeRom scenes). Secondary story scenes up to 1st star fully finalised.
+Artists and I continue to finalise fixes, this is a work in progress.
+Rendered and prepared for further processing 3 scenes (1 secondary story scene and 2 FreeRom scenes). Secondary story scenes up to 1st star are fully rendered. However, an important thing to mention, almost all renders for scenes are ready, but a scene is not considered fully rendered until all animations in that scene are rendered as well. So there are still scenes with animations left, which means the progress of this block will slow down a bit.
+Rendering work continues.
+Processed 15 scenes (6 story scenes, 8 minor scenes, 1 FreeRom).
+Work on processing continues.
+Color correction of 11 scenes (5 story scenes and 6 minor scenes).
+Work on color correction continues.
+Launch a full time focus on the assembly of scenes into code has not yet been possible, but we continue to work on it.
+Work on assembling scenes into code continues.

With great gratitude, Super Alex.
 
  • Heart
  • Like
Reactions: Pill07 and Mark-777
3.40 star(s) 197 Votes